Project Summary

0815 Online Handel GmbH operates a Shopware 6 store with more than 90,000 products in Austria. During a peak trading period, its internal engineering team needed additional specialist capacity to keep a large-scale performance optimization initiative moving.

Elogic Commerce provided a certified Shopware engineer who joined 0815’s engineering team as an extension of it. Within ten days, the engineer was productive inside the existing codebase and went on to complete 42 performance optimization tasks, with average response time reduced by 32%. Elogic Commerce did not migrate, rebuild or re-platform the store, and did not take ownership of the initiative.

The engineer was productive inside the client’s environment in under ten days, and the full planned scope was delivered on schedule.

Key Outcomes

32%

reduction in average response time across the engagement.

42

performance optimization tasks completed across the existing Shopware 6 implementation.

< 10

days to productive contribution. A certified Shopware engineer joined 0815's existing codebase, environments and team practices and became productive within ten days.

extended

existing team without ownership transfer. 0815 added certified Shopware capacity while retaining architectural, technical and delivery ownership.

Client

0815 Online Handel GmbH

Industry

Online retail, maintenance and household equipment

Region

Austria

Platform

Shopware 6

Services

Team extension, embedded Shopware engineering

Engagement model

One certified Shopware engineer embedded in the client's engineering team

Context

Large-scale performance optimization initiative during a peak trading period

About the Client

0815 Online Handel GmbH was founded in Vienna in 2007 and sells a broad range of maintenance and household equipment online. The retailer carries more than 90,000 products across 1,400 categories, giving it a substantial presence in the Austrian market.

The store runs on Shopware 6, integrated with Microsoft Navision through a connector.

At this scale, performance engineering requires specialist Shopware knowledge and careful coordination with the existing architecture. Those demands become acute during peak trading, when traffic and order volume rise at the same time that tolerance for a regression drops close to zero.

Project Complexity

A peak trading period, which compresses onboarding time and reduces tolerance for risk in every change.
An existing production architecture and codebase that the engineer joined rather than designed.
Established team conventions, review processes and deployment practices that an external engineer has to absorb quickly to be useful rather than disruptive.
An initiative already in progress, requiring the engineer to contribute inside a direction that had already been set.
Client confidentiality constraints on the technical detail of the work.

Business Challenge

01

A performance initiative running into a peak period

The work needed to progress at exactly the point in the year when engineering attention is most contested.

02

Capacity was the constraint, not direction

0815’s team had already established the technical direction. The constraint was execution capacity, not strategic or architectural direction.

03

Capacity was needed without transferring ownership

0815 needed additional specialist Shopware capacity during a peak trading period while keeping technical and architectural ownership inside its existing team.

04

Onboarding time is a real cost

External capacity that takes six weeks to become productive is not capacity during a peak period. The onboarding curve had to be short enough that the engineer contributed inside the window that mattered.

05

Architectural control needed to stay in-house

A large Shopware environment integrated with Navision is not something a retailer hands over. Any external contribution had to work within decisions the client had already made.

Elogic Commerce's Contribution

Note: the specific findings and technical detail of the performance work are covered by client confidentiality and are not described here.

A certified engineer, not a generic developer

Elogic Commerce supplied a Shopware-certified engineer with production experience, reducing the platform-specific learning curve and allowing the engineer to contribute quickly inside an existing Shopware 6 environment.

Onboarding inside ten days

The engineer was productive within 0815’s codebase, environments and team practices in under ten days. On a peak-period engagement, that number is the difference between capacity and overhead.

Working within the client’s architecture

The engineer completed 42 performance optimization tasks over the course of the engagement, contributing to analysis, optimization and remediation within 0815’s existing Shopware implementation and development practices.

Delivery to schedule

The full planned scope was delivered on time, through the peak period.

Results & Delivery Impact

Operational

The engineer became productive within ten days and completed 42 performance optimization tasks, with the full planned scope delivered on schedule during peak trading. Average response time reduced by 32% across the engagement.

Delivery

0815 added specialist Shopware capacity without changing its existing architecture, delivery model or technical ownership.

Risk

The engagement avoided the disruption associated with transferring ownership or introducing a parallel implementation alongside the client's own initiative.

Commercial

The engagement gave 0815 additional specialist capacity without transferring ownership of the performance initiative to an external delivery team.

Capabilities Demonstrated

01

Certified Shopware 6 engineering

02

Team extension and embedded engineering delivery

03

Rapid onboarding into an existing production codebase

04

Working within a client's architecture rather than replacing it

05

Delivery under peak-trading constraints

06

Performance analysis, optimization and remediation on a large-catalog Shopware implementation

07

Integration into established client review and deployment practices

08

Engagement scoping and on-time delivery management

09

Operating under client confidentiality constraints

Best Fit For

In-house engineering teams that need experienced Shopware capacity quickly without transferring ownership of the platform.

Merchants running large Shopware catalogs where performance work competes with the rest of the roadmap.

Businesses facing a peak period with work that cannot wait for a hiring cycle.

Organizations that want to keep architectural control while adding specialist capability.

Teams whose blocker is capacity rather than direction.

When This Solution Is a Good Fit

01

You have an in-house engineering team and want to extend it rather than hand work over.

02

Your platform decisions are already made and the constraint is execution capacity, not strategy.

03

You can give an external engineer access to your codebase and environments quickly.

04

The work is well enough understood that an experienced engineer can contribute without a long discovery phase.

05

You need capacity on a timeline that hiring cannot meet.

06

You want the engineer working to your conventions rather than importing an agency's.

Need Shopware Performance or Engineering Support?

If your Shopware store is facing a performance initiative, a critical release, or a temporary capacity gap, Elogic Commerce can provide certified Shopware engineers who work inside your existing architecture and development team. Talk to Elogic Commerce about Shopware performance and engineering support.