Luma to Hyvä Migration Checklist for Adobe Commerce B2B

Luma to Hyvä Migration Checklist for Adobe Commerce B2B

Ecommerce replatforming
8 min read Published: Last Updated:
Ecommerce replatforming
Luma to Hyvä Migration Checklist for Adobe Commerce B2B

Summary

Key takeaways

  • An Adobe Commerce B2B migration to Hyvä is ready when the people who buy, approve and fulfill orders can finish their work on the new storefront, not when the catalog pages look faster.
  • Start with the signed-in routes that bring in orders. Inventory the company, role and transaction path behind each one, and mark it for Hyvä, a temporary Luma fallback or a rebuild.
  • For distributors, the release unit is often a complete company purchase. A faster catalog has little value if the buyer loses an approved quote on the way to checkout.
  • Hyvä’s documented B2B path requires Adobe Commerce 2.4.6 or later and the Adobe B2B extension 1.4.0 or later. Record the exact versions of every storefront, checkout, payment, shipping and ERP connector package.
  • This approach applies to Adobe Commerce deployments that use Magento’s theme layer. Adobe Commerce as a Cloud Service uses a separate storefront model.
  • Hyvä can keep selected routes on Luma through theme fallback. Treat each fallback as a separately tested part of the journey, with an owner and a condition for removing it.
  • Track each journey in a release workbook with its store view, role, theme, package versions, staging evidence, launch blocker and rollback owner.
  • Rehearse the hardest representative trade order with the release owner present, and use clear go, hold and recover criteria.
  • Gabriel & Co. kept its consumer store and B2B retailer portal online through the Hyvä deployment, with USD and CAD support and six integrations preserved.
  • Measure signed-in buyer journeys with first-party real-user monitoring and task timings, because public Chrome UX Report data does not cover private pages.

When this applies

This checklist is for Adobe Commerce B2B merchants on cloud infrastructure or on-premises deployments that use Magento’s theme layer and plan to move from Luma to Hyvä. It fits distributors and manufacturers whose buyers sign in to company accounts with roles, assigned catalogs and prices, Quick Order and requisition lists, negotiable quotes, purchase order approvals, company credit and payment gateways connected to an ERP or OMS. Platform, wholesale, sales operations, payments and integration leads can use the route inventory, the release workbook, the go, hold and recover criteria and the post-launch measures to plan which journeys ship together and how to prove each one before and after cutover.

When this does not apply

This checklist is not meant for Adobe Commerce as a Cloud Service, which uses a separate storefront and extensibility model, or for consumer-only stores without company accounts, approvals or ERP-driven ordering. It also does not cover a full replatforming to another commerce system. If the installed Commerce or B2B extension versions are below what Hyvä’s B2B path requires, the platform needs upgrading before this migration plan can be used. Results from other projects, such as the Benum Total Blocking Time drop or the BUFF deployment times, are observations from those engagements and should not be treated as targets for a different store.

Checklist

  1. Confirm that the store runs Adobe Commerce 2.4.6 or later with the B2B extension 1.4.0 or later on a theme-based deployment.
  2. Record versions of Commerce, B2B, Hyvä Theme, Enterprise storefront and checkout packages, payment and shipping extensions and the ERP connector.
  3. List the signed-in routes that bring in orders, such as company switching, Quick Order, requisition lists, quotes, purchase orders and checkout.
  4. Check each important route against the vendor compatibility tracker.
  5. Create fixture accounts for a purchaser, an approver, a company administrator and a guest or public control.
  6. Mark each route for Hyvä, temporary Luma fallback or rebuild.
  7. Build a release workbook row for each journey with store view, role, route, theme, versions, evidence, blocker and owner.
  8. Test company switching so prices, catalog and order history follow the selected company.
  9. Test repeat baskets, negotiated quotes and purchase order approvals through to one acknowledged ERP order.
  10. For each Luma fallback route, test cart and session continuity, back navigation and successful and failed payments.
  11. Give every temporary fallback an owner and a clear condition for removing it.
  12. Sample public URLs for status codes, canonicals, hreflang, robots directives, redirects and analytics events.
  13. Rehearse the hardest trade order and the rollback with the release owner present, then check pending payments, callbacks and queued exports.
  14. Agree on go, hold and recover criteria with named owners before cutover.
  15. Add real-user monitoring and task timings for signed-in routes, without sending company IDs, prices or quote details to analytics.

Common pitfalls

  • Judging migration readiness by catalog speed instead of by completed company purchases.
  • Applying this theme-based approach to Adobe Commerce as a Cloud Service.
  • Testing only as a company administrator and missing purchaser, approver and permission cases.
  • Assuming package compatibility from vendor notes without testing the installed combination.
  • Leaving Luma fallback routes in place with no owner or exit condition, which creates a second cutover later.
  • Not testing cart and session continuity when buyers move between Hyvä and Luma routes.
  • Shipping a route when ERP retries or delayed acknowledgments are still unresolved.
  • Rolling back the storefront without reconciling orders, payments and exports placed during the window.
  • Relying on public Chrome UX Report data, which does not cover signed-in buyer pages.
  • Sending company IDs, contract prices or quote details to analytics tools.

An Adobe Commerce B2B migration is ready when the people who buy, approve and fulfill orders can finish their work on the candidate storefront. Start with the signed-in routes that bring in orders. Inventory the live company, role and transaction path behind each one, then mark it for Hyvä, temporary Luma fallback or a rebuild.

Elogic Commerce moved Gabriel & Co.’s consumer storefront and B2B retailer portal to Hyvä. Both stayed available through the deployment, with USD and CAD support and six integrations preserved, including Dynamics 365 Business Central and UPS. The work illustrates the continuity a migration must prove when several systems share an order. The performance program that followed the cutover lasted three to four months. Gabriel & Co. Hyvä migration

The release unit for a distributor is often a complete company purchase. A faster catalog has limited value to a buyer who loses an approved quote when they move to checkout. Use that buyer’s journey as the boundary for testing and for deciding what ships together.

Three release paths for Adobe Commerce B2B routes: Hyvä, temporary Luma fallback and rebuild
Use the same company, buyer and order evidence when evaluating each route. Hyvä documents route-level fallback for selected storefront pages.

Identify the stack and the routes that bring in orders

This checklist covers the native B2B extension on Adobe Commerce deployments that use Magento’s theme layer, including Adobe Commerce on cloud infrastructure. Adobe describes Adobe Commerce as a Cloud Service as an out-of-process extensibility model. Its Adobe Storefront documentation covers a separate storefront path. Adobe Commerce SaaS and PaaS comparison

Hyvä’s installation guide specifies Adobe Commerce 2.4.6 or later and Adobe’s B2B extension 1.4.0 or later for its documented B2B path. Record the actual Commerce and B2B patch levels, Hyvä Theme, Enterprise B2B storefront and checkout compatibility packages, checkout branch, payment and shipping extensions, and ERP connector build. Check each important route against the vendor tracker and test the installed combination. Hyvä Enterprise installation · Enterprise compatibility tracker

Where to startEvidence to collect
Company accountSign-in, company selection if enabled, role permissions, address book and order history. Record company and website scope for each fixture.
Buying and reorderingAssigned catalog and price, quantity breaks, Quick Order, requisition lists and product configuration. Record each extension’s frontend dependency.
Authorization and paymentQuote conversion, PO approval, company credit, shipping and gateway behaviors. Capture who acts at each step and how payment completes.
Downstream orderCommerce order and ERP or OMS acknowledgment. Match account, SKU, unit, amount and status. Identify the export and retry owner.

Give every journey a representative buyer and one exception. Start with a purchaser, approver, company administrator and a guest or public control where applicable. Company hierarchies, switching and permissions should have their own rows when merchants depend on them.

When can a Luma route stay live?

Hyvä can apply a Luma-based theme on configured routes or matching URL paths. The fallback page loads Luma dependencies and styles. Treat it as a separately tested part of the journey. Check transitions from account or cart to that route, back navigation, session continuity and the expected order result. Assign an owner and an exit condition before you plan a second cutover. Hyvä Luma theme fallback · Hyvä checkout documentation

For public category and product URLs that change with the theme, sample response codes, canonical and hreflang tags, robots directives and analytics events. Rehearse changed-URL redirects and confirm private buyer data stays behind account controls.

Build the release workbook

The rows below are illustrative acceptance cases. Copy them into your release workbook and replace route names, owners and expected results with your configuration. Record the website, store view, company role, live URL or route, planned theme, package versions, staging evidence, launch blocker and rollback owner on every row. Mark vendor documentation, observed staging results and client case evidence as distinct sources.

Journey and actorExample release choiceEvidence that clears the rowOwner
C01 Company switching by an authorized buyerHyvä after permissions testThe company context, prices and order history follow the selected company. A public or second-company fixture sees its own terms.Platform lead
C02 Repeat basket from Quick Order or a listHyvä if extension paths passEligible SKU quantities reach the cart. Invalid lines and unavailable items get the agreed handling.Wholesale lead
C03 Negotiated quote accepted by buyerHyvä after end-to-end testThe accepted revision and negotiated amounts become one Commerce order and one acknowledged export.Sales operations
C04 PO awaiting approver actionHyvä once approval and payment passBuyer, approver and payment actor can complete their steps. Order release follows the configured gate.B2B product owner
C05 Custom gateway used by a trade buyerTemporary Luma when verifiedCross-theme cart and session persist. A successful and a failed sandbox payment produce the intended order states.Payments lead
C06 ERP export with delayed acknowledgmentHold if retry behavior is unresolvedOne acknowledged ERP order reconciles to the Commerce order. Failed or delayed exports reach an owner.Integration lead

For C02, test the repeat-basket paths described in Quick Order and requisition lists on Hyvä. For C04, follow the approval and payment checks in Hyvä Checkout for Adobe Commerce B2B.

In the temporary checkout example, record the actual fallback route and the condition for removing it. A migration team could retire that bridge once the gateway package and shipping rules pass in Hyvä, including a decline, recovery and order export. Confirm all dependencies through the same gateway configuration used for launch.

For C03, save the route and package versions with the accepted quote revision, expected net amount, Commerce order reference and ERP acknowledgment. Assign the person who holds the release if totals disagree and the owner who restores the prior route if the defect escapes. For approval and payment paths, see Hyvä Checkout for Adobe Commerce B2B.

Rehearse the order and the rollback

Run the hardest representative trade order while the release owner is present. Use an account with a negotiated offer or a PO approval and follow the transaction into the ERP. Verify who approved, which price and freight were used, whether the gateway and order state agree, and what reached fulfillment. Then run the same journey through any Luma bridge. This gives the release team a record it can compare during cutover. For contract price and stock checks, see ERP contract pricing on Hyvä B2B.

B2B order trace from quote and PO approval to payment, Commerce order and ERP acknowledgment
Capture the IDs and amounts in authorized project evidence. Use anonymized examples if an article or case study includes transaction details.
DecisionEvidence and action
GoAll critical routes pass and the release owner has reviewed the payment and order evidence. Temporary routes have an owner and a removal condition.
HoldA dependency, missing payment path or thin live sample leaves an important route unverified. Record the unresolved condition and its owner before expanding.
RecoverConfirmed wrong trade terms, lost or duplicate orders, or a broken permission gate. Use the rehearsed recovery path and reconcile orders already placed.

Practice restoring storefront routing while the team can still observe the checkout and integrations. Record who can revert a shared module or configuration if it affects both themes. After any recovery, check pending payments, order numbers, callbacks and queued exports. An order placed during the window continues to need an owner and a verified destination.

For a group of markets that shares a release window, Elogic Commerce’s BUFF case offers another reference. The Hyvä deployment preserved 15 integrations. The recorded backup took 14 minutes and deployment took 33. The team reopened after real test orders worked. BUFF migration

Measure signed-in buyer journeys before and after launch

Add first-party real-user monitoring for the authenticated routes where your buyers do their work. Public Chrome UX Report data requires publicly discoverable and sufficiently popular pages. Tag events with a route group, release version, device and market. Use a non-identifying role category and omit company IDs, contract prices and quote details from analytics.

MeasureDefinition for baseline and follow-up
Page experienceCompare p75 LCP, INP and CLS by route and device with the date range and sample count. Google’s good thresholds are LCP at or below 2.5 seconds, INP at or below 200 ms and CLS at or below 0.1.
Task completionMeasure time from opening Quick Order to the first valid cart, from quote acceptance to an order, and from PO submission to the last required approval. Use the same event boundaries in both windows.
Customer and order outcomesReport eligible attempts, completed journeys and ERP acknowledgments by comparable market and cohort. Record promotions, inventory changes or ERP cutovers that could explain movement.

Use controlled lab runs to diagnose slower templates, JavaScript or API calls and identify where the team should look. Benum’s Hyvä redesign reports a fall in average desktop Total Blocking Time from 848 ms to 260 ms. Treat that as a lab observation for the redesign. An authenticated buyer benchmark needs route-level field data and task timings from comparable periods. Google Web Vitals · Chrome UX Report methodology · Benum redesign

What changes the migration estimate?

Cost driverWhat to count before asking for a price
B2B routes and extensionsDistinct journeys, unsupported frontend components and the package combinations that need acceptance.
Checkout and ERP scopeGateway and shipping paths, approval rules, account pricing, and downstream acknowledgment and reconciliation tests.
Cutover and ongoing supportRelease waves, rehearsal windows and maintenance for any temporary Luma routes.

Price implementation and support separately from current Hyvä and Adobe entitlements. Use the Hyvä Theme guide for the broader license and budget discussion.

What should a migration readiness review cover?

Bring the current extension list, your buyer roles and one representative order. Confirm the B2B package matrix, follow the order downstream and list the decisions that affect scope and cutover. Elogic Commerce can review which routes can migrate together and which dependencies need a staged handoff. Request a migration readiness review

How useful was this post?

Click on a star to rate it!

Davis
Get in Touch
Looking for a partner to grow your business? We are the right company to bring your webstore to success.
Table of contents